Motor Side Cover
Delivery term:The date of payment from buyers deliver within days- Price:
Negotiable
- minimum:
- Total supply:
- Delivery term:
The date of payment from buyers deliver within days
- seat:
Guangdong
- Validity to:
Long-term effective
- Last update:
2021-08-25 12:35
- Browse the number:
426
- Shenzhen Meiyadi Technology Co., Ltd By certification [File Integrity]
-
Contact:
meiyadi(Mr.)
- Email:
- Telephone:
- Phone:
-
Area:
Guangdong
-
Address:
102, No. 133, Haoyong Second Industrial Zone, Hongxing Community, Songgang Street, Baoan District, Shenzhen
- Website: http://www.mydcasting.com/ http://meiyadi.wiremesh-machine.net/
Product details
Product Image
Product Introduction
The conventional electric motor adopts brushless dc motor, including connected to the motor shaft for the integration of the stator component, connected to the electric car wheel hub is an organic whole, and described the stator component magnetic coupling connection and coaxial output exterior rotor components, by installing the bearing can be relatively rotation to install it at the ends of the motor shaft side cover and the side cover, among them, The side cover and the side cover are fixedly connected with the outer rotor assembly through screws. Usually, the electric vehicle motor side cover and drum brake end cover are respectively installed on both sides of the electric vehicle, its shape and structure will directly affect the electric vehicle motor heat dissipation performance and installation strength, but also directly determine the electric vehicle wheel beauty.
Product Parameter
Origin:China
Material:Aluminum
Quantity:1 PCS
Colour:2 colours (brown black)
Condition:100% Brand New
Packing:Boxes
Product Application
Motor side cover is the key part of gear pump and plunger pump in loader, excavator, bulldozer, forklift, truck crane and truck.We provide OEM and customization services, welcome to consult.
Production Details
Product Qualification
In addition, we have BSCI and UL certification.
Our Company
Packaging & Shipping
● Packaging:
1. The quantity suitable for exporting goods
2. No other packaging accessories are normal
3. The packaging required by customers can be provided
● Shipping: By air, sea, or express
● Delivery time: About 25~30 days after order details and production confirmed.
FAQ
Q1. Where is your factory located?
A: In Songgang industry area,Shenzhen city,China.
Q2. When did your factory established?
A: Since 2016
Q3. What is your main market?
A: Europe, The North America, South America, Australia, The middle east, and etc.
http://www.mydcasting.com/
-
Hydraulic Hammer Dust Seal
price: Negotiable
-
Oganic Bilbery Extract
price: Negotiable
-
VMC550 CNC Vertical Machining Center
price: Negotiable
-
Stainless Steel Glass Spigot
price: Negotiable
-
1500 Asphalt Mixture Mixing Equipment-gas Type
price: Negotiable
-
Cup-making Blister Online Crusher
price: Negotiable